{"id":61519,"date":"2021-11-10T11:18:55","date_gmt":"2021-11-10T11:18:55","guid":{"rendered":"https:\/\/pr.asianetpakistan.com\/?p=82260"},"modified":"2021-11-10T11:18:55","modified_gmt":"2021-11-10T11:18:55","slug":"longi-achieves-new-milestone-for-hi-mo-5-module-shipments","status":"publish","type":"post","link":"https:\/\/lebanonnewsgazette.com\/longi-achieves-new-milestone-for-hi-mo-5-module-shipments\/","title":{"rendered":"LONGi achieves new milestone for Hi-MO 5 module shipments"},"content":{"rendered":"
\n
\n
\n

XI’AN, China, Nov. 10, 2021 \/PRNewswire\/ — As of early November, LONGi’s Hi-MO 5 (72C) modules had been supplied to some 600 clients in 57 countries, with cumulative shipments now exceeding 10GW.<\/p>\n

The Hi-MO 5 module is designed for utility-scale PV plants, and its dimensions are\u00a0the result of in-depth analysis of industry chain, product value and lifecycle reliability, with the latest shipment milestone confirming that the module’s design concept has been widely accepted by global customers.<\/p>\n

\"LONGi\u2019s<\/div>\n

Shipments of the Hi-MO 5 module are based on a reliable packaging method to maximize use of container capacity while also leaving enough space for loading and unloading, significantly reducing shipping costs. The module is also fully compatible with brackets, inverters, and other PV plant equipment under a variety of application scenarios, reducing BOS costs. In wind tunnel, hail, and dynamic mechanical load (DML) testing the Hi-MO 5 has shown outstanding performance, ensuring reliability in extreme meteorological conditions throughout its full lifecycle.<\/p>\n

\"LONGi<\/div>\n

Milestone review of the LONGi Hi-MO 5 module:<\/p>\n