Beirut: Middle East Airlines (MEA) said its summer 2025 operations were disrupted by a global crisis involving Pratt and Whitney engines that power Airbus A321neo aircraft, forcing three of its planes out of service. The company stressed the problem has affected more than 500 aircraft worldwide.
According to National News Agency – Lebanon, MEA explained the grounding came earlier than expected, disrupting summer schedules that had been planned around an anticipated 2026 deadline for engine overhauls. The airline emphasized that flight safety was never compromised.
Faced with the sudden shortage, MEA said it had two options: cancel flights and refund passengers or secure alternative solutions. Given peak-season demand, the company chose to lease three aircraft with crews from a Lithuanian operator certified under European safety standards.
These planes offer standard European business class rather than MEA’s premium product.
Addressing criticism on social media, MEA released figures showing that in August
2025 it operated 1,301 flights carrying about 337,000 passengers, of which only 111 flights (8.5%) were on leased aircraft.